DSpace at My University FE - Faculdade de Engenharia FE - Engenharia Civil
Use este identificador para citar ou linkar para este item: http://monografias.uem.mz/handle/123456789/2823
metadata.dc.type: Trabalho de Conclusão de Curso
Título: Dimensionamento e execução de torre metálica para a sustentação de quatro depósitos de água de 10 000 litros
metadata.dc.creator: Mabota, Tomás Félix Matonga
metadata.dc.contributor.advisor1: Ricardo, Francisco
metadata.dc.contributor.advisor2: Quadros, Carlos
metadata.dc.description.resumo: O presente documento refere-se ao relatório do estágio profissional realizado na empresa GEODRILL,LDA – Sondagens e Obras Geotécnicas, localizada na Av. 25 de Setembro, nº 2526,1º andar-Cidade de Maputo. Este estágio insere-se no plano curricular vigente na Faculdade de Engenharia da Universidade Eduardo Mondlane como forma de culminação do curso para a obtenção do grau de licenciado em Engenharia Civil. É apresentado neste relatório o dimensionamento e a execução de uma torre metálica para a sustentação de quatro depósitos de água de 10 m3 cada, de aproximadamente 15,60 m de altura ao nível da base dos depósitos para o Sistema de Abastecimento de Água da Vila de Mopeia - Província da Zambézia. A estrutura metálica é composta basicamente por duas partes: a plataforma, que é a base que recebe os depósitos de água, constituída por grelhas metálicas, vigas principais e secundárias em perfis I e a base de sustentação da plataforma formando treliça e materializada por cantoneiras de abas iguais. As ligações entre os diferentes elementos são realizadas por parafusos tornando a sua montagem simples e rápida quando comparada com as soldaduras. O processo de fabricação compreende duas fases: o corte e a furação baseados nos desenhos de execução. Sendo uma estrutura com ligações aparafusadas há uma necessidade de proceder a pré-montagem no estaleiro de modo a verificar-se a compatibilidade dos furos e proceder o seu ajuste caso seja necessário bem como a marcação das peças e suas posições o que facilita o processo de montagem. A montagem consiste no posicionamento e fixação das peças nos respectivos lugares em obra. Este processo foi realizado recorrendo a um sistema de roldas. Não foi possível apresentar a execução completa da torre devido as dificuldades encontradas no local, isto é, a alteração do local previamente indicado pra a implantação da estrutura e as condições climatéricas, o que levou ao prolongamento do período de execução da obra.
Resumo: This document refers to the professional internship report carried out at the company GEODRILL, LDA – Surveys and Geotechnical Works, located at Av. 25th of September, nº 2526, 1st floor-City of Maputo. This internship is part of the plan current curriculum at the Faculty of Engineering of the Eduardo Mondlane University as a form of completion of the course to obtain the degree of licentiate in Civil Engineering. This report presents the design and execution of a tower metal to support four water tanks of 10 m3 each, of approximately 15.60 m high at the base of the deposits for the Water Supply to Vila de Mopeia - Zambézia Province. The metallic structure is basically composed of two parts: the platform, which is the base that receives the water tanks, consisting of metal grids, main beams and secondary in profiles I and the support base of the platform forming a truss and materialized by angles with equal flaps. The connections between the different elements are carried out by screws making their assembly simple and quick when compared to welds. The manufacturing process comprises two phases: cutting and drilling based on the execution drawings. As a structure with bolted connections there is a need to carry out pre-assembly on the shipyard in order to verify the hole compatibility and adjust it if necessary, as well as the marking of parts and their positions which facilitates the assembly process. Assembly consists of positioning and fixing the parts in their respective places. building. This process was carried out using a roller system. It was not possible to present the complete execution of the tower due to difficulties found in the place, that is, the alteration of the place previously indicated for the implantation of the structure and the weather conditions, which led to the extension of the period of execution of the work (TRADUÇÃO NOSSA).
Palavras-chave: Estruturas metálicas
Torres metálicas
Dimensionamento estrutural
Aço estrutural
metadata.dc.subject.cnpq: Engenharias
Engenharia civil
metadata.dc.language: por
metadata.dc.publisher.country: Moçambique
Editor: Universidade Eduardo Mondlane
metadata.dc.publisher.initials: UEM
metadata.dc.publisher.department: Faculdade de Engenharia
metadata.dc.rights: Acesso Aberto
URI: http://monografias.uem.mz/handle/123456789/2823
Data do documento: 1-Mar-2022
Aparece nas coleções:FE - Engenharia Civil

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
2022 - Mabota, Tomás Félix Matonga.pdf5.82 MBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.